Call us TODAY! Miami: +1 786.220.4654; Panama: +507 757.9566; Cell: +507 64.30.40.50

October 2008: Completing the second canal

The excavators begin their dance: Handing the removed soil in a chain to each other, the trick is to open up the channel with minimum disturbance to the flowing water, so that any sediment churned up can quickly settle, leaving the water in the new section clear.

October 2008: Javier consults with colleagues.
October 2008: The excavators begin their dance.
October 2008: Completing the second canal.
October 2008: Completing the second canal.
October 2008: Completing the second canal.
October 2008: Completing the second canal.
October 2008: Completing the second canal.
October 2008: In full flow.
October 2008: The waters at different levels.
October 2008: The waters level off.
October 2008: Fausto Alvarez gives the thumbs up.

The Dreamscape Group Copyright: The DreamScape Group